WhatsApp Support: +971523007316
Only employers with package can download candidate's CV.

Harsh Gandhi

Harsh Gandhi, Bachelor in Civil Engineering, with 6+ Years of Experience in Project Execution & Site Engineer

About

Mumbai, India
+91 8898832849

General Information

  • Address Borivali, Mumbai, India
  • Job Locations  United Arab EmiratesAbu DhabiDubaiFujairahSharjah
  • Job Category  EngineeringOil & GasReal estate
  • Language English, Hindi
  • Highest Degree Level Bachelor in civil engineering
  • Total Years of Experience +6 core & 1 internship
  • Expected Job Level senior site engineer/ project engineer/ Assistant project Management, Project coordinator, Planning/Estimation Coasting Engineer

Work Experience

02/2019 to Till Date
Radhe Civicon Pvt. Ltd. Senior Site Engineer

Project Details-
1. Project – Naman Habitat, Andheri West, Mumbai.
Name of Client – Bharat Infra Pvt Ltd
Name of Client – Shree NamanrnGroups
Project Details – RCC contract ofrn1.8 lac sq.ft, 19 storey residential cum commercial tower with 5 podium &rnamenity floors, 3 basements for parking.
2. Project – Maitri Gaurav, MaladrnEast, Mumbai.
Name of Client - Joint venture project with Maitri GauravrnGroups
Project Details -1 lac sq.ft, 18 storey, residential of twornwing tower with Pit parking & Podium.
3. Project – Kalpvruksh, Kandivali West, Mumbai.
Name of Client - Joint Venture project with Maitri GauravrnGroups
Project Details -60k sq.ft, 22 storey residential towerrnwith pit & stack parking.
4.  Project – Bharat Asbury Park, Kandivali  West, Mumbai.
rnrnrnrnrnrnrnrnrnrnrnrnrnrnrnrnrnrn


Summary of Skills

Organization
100%

AWARDS

Acadamic Certificate of final year project on , Re tempering of concrete made by using artificial sand. (2013-2014 )

Increasing initial setting time of concrete by adding extrarnwater and by adding extra cement maintain its original strength and makingrneconomical by eliminating natural sand by artificial sand which also increasernworkability of concrete by reducing water requirement of re temper concrete.

rnrn

Measuring compressive strength of Re-temper concrete within therntime duration from 0 to 135 min. Also check it`s workability by slump cone testrnwith same interval of time.

rnrn

 Increase Initial setting time of concrete with maintain of itsrnstrength. Eliminating natural sand byrnartificial sand with its application.


Contact Harsh Gandhi

Find Latest Job update Across Dubai, Sharjah and Abu Dhabi

Contact Us

[email protected]

WhatsApp Support: +971523007316