Harsh Gandhi, Bachelor in Civil Engineering, with 6+ Years of Experience in Project Execution & Site Engineer
About
General Information
- Address Borivali, Mumbai, India
- Job Locations United Arab Emirates, Abu Dhabi, Dubai, Fujairah, Sharjah
- Job Category Engineering, Oil & Gas, Real estate
- Language English, Hindi
- Highest Degree Level Bachelor in civil engineering
- Total Years of Experience +6 core & 1 internship
- Expected Job Level senior site engineer/ project engineer/ Assistant project Management, Project coordinator, Planning/Estimation Coasting Engineer
Education
Work Experience
- Radhe Civicon Pvt. Ltd. Senior Site Engineer
-
Project Details-
1. Project – Naman Habitat, Andheri West, Mumbai.
Name of Client – Bharat Infra Pvt Ltd
Name of Client – Shree NamanrnGroups
Project Details – RCC contract ofrn1.8 lac sq.ft, 19 storey residential cum commercial tower with 5 podium &rnamenity floors, 3 basements for parking.
2. Project – Maitri Gaurav, MaladrnEast, Mumbai.
Name of Client - Joint venture project with Maitri GauravrnGroups
Project Details -1 lac sq.ft, 18 storey, residential of twornwing tower with Pit parking & Podium.
3. Project – Kalpvruksh, Kandivali West, Mumbai.
Name of Client - Joint Venture project with Maitri GauravrnGroups
Project Details -60k sq.ft, 22 storey residential towerrnwith pit & stack parking.
4. Project – Bharat Asbury Park, Kandivali West, Mumbai.
rnrnrnrnrnrnrnrnrnrnrnrnrnrnrnrnrnrn
Summary of Skills
AWARDS
- Acadamic Certificate of final year project on , Re tempering of concrete made by using artificial sand. (2013-2014 )
-
Increasing initial setting time of concrete by adding extrarnwater and by adding extra cement maintain its original strength and makingrneconomical by eliminating natural sand by artificial sand which also increasernworkability of concrete by reducing water requirement of re temper concrete.
rnrn
Measuring compressive strength of Re-temper concrete within therntime duration from 0 to 135 min. Also check it`s workability by slump cone testrnwith same interval of time.
rnrn
Increase Initial setting time of concrete with maintain of itsrnstrength. Eliminating natural sand byrnartificial sand with its application.